Design Trends in Bathroom Tile

Top 10 Best contractors - Blog - Ask A Question - ?Picture frame? a windowDoes your bathroom have a window that seems a little out of place? Try incorporating it into your tile design by creating a ?picture frame? around it in place of a traditional sill. For a totally finished look, simply remove a window?s existing wood casing and replace it with tile. And to really tie the look together, incorporate tile used elsewhere in the room. Get free estimates - copper roof, copper roofing, composition roof, corrugated roofing. we arecommend a natural stone or ceramic border tile with some depth for the best results ..More

  • Residential & Commercial Services Madera, CA
  • Home Repair Specialist Tulare, CA
Featured Contractor: Leo G

Locate Nearby licensed contractors - Blogs On Diagnosis & Repair - So I got a job up the road for a couple of brothers that did the same thing but on a more modern house. I told them OK. The boss seemed to like me and started me out in the field. Most of you know me here because of my moderator position. I was there for 8 months when they had a shop wide layoff. Sent it into the machine and it came to a screeching halt. I was very upset with him as your bank account shouldn?t be depleting while you are working full time. One day we made a big box and the back wasn?t fitting into the flush into the dado because it wasn?t deep enough. I named my company is LRG WoodCrafting, I have no imagination LOL. All my seniority, sick days and vacation time were scrapped as I was a new employee? strike one & two. I said sure, didn?t know it would end up being a career. A buddy of mine got me a chance with a construction company. We made everything that would go into 17th and 18th century homes. What do you expect from people that have little skills being paid minimum wage. He cranked the machine so it would take a 1/16? off at once, which I knew it couldn?t do and told him so, he didn?t care. I worked there until 1990 when it became apparent that he was having a hard time with his bills. Drove me made. I clarified to him that I wasn?t going to be coming back. Get free quotes - asphalt shingles, solar roof, roll roofing, rubber roofing. I was given the ultimatum that I could either work for them full time or I was gone. Digging ditches then painting then wide board flooring then framing on post and beam houses. Had to hire a crew at minimum wage. Next job I got was with a kitchen shop. I was there for another 3 months before he started screaming at me for asking a question. They hired me as the manager. After about a month we were able to get up to about 31 a day. From that time on I was on my own. I was doing a substantial amount of work for someone who was only suppose to be managing. I told him to get out of my shop. I could never get a system down because he would constantly change it. I quit on the spot, took my stuff and vacated. I started out with a single post like the all of you did. Couldn?t squeak out those other 4. I worked there the week and was called to the office. Leo GLRG WoodCraftinglrgwood. After a while I started paying for the rent on the shop he had been renting and then eventually I got a place a few miles from my home. The boss asked me if I?d like to try working inside the millwork shop. Been there ever since. All of which I was adequate at but really not enjoying. I started it officially in 1997, but I?ve been in woodworking since 1985. The first 5 months things were OK there. About 3 weeks into that kitchen I got called back to the millwork job. Of course that wasn?t always the way. I was pissed. I had asked about it at the beginning of the week and was told nothing like that was happening. My next job was in a speaker manufacturer. Currently we have been together for 28 years, my oldest has graduated from college with his bachelors in science and my youngest is in high school, mostly with honors. And I didn?t see him on the floor for about 2 months. We got hitched in ?86 and bought a house in ?89 and had two boys. Just a shop that so happened to make speakers boxes. I am happily married to my sweetheart of a wife. I asked for an experience worker and was denied. Hated to leave the job, but I was owed money and he took 12 weeks to pay off six weeks of what he owed me. My name is Leo Graywacz. It was going to slow for him. Then the brothers split up there partnership and of course I ended up with the jerk. The owner would come into the shop and rearrange things nearly every day to make things more ?efficient?. I asked him why?s that? He said because I accepted his ultimatum. I started out needing a job for the summer after going through a few jobs that weren?t my cup of tea. The guy that hired me to do the kitchen kept me busy for a long time and slowly but surely pushed me into being an independent contractor. Production quota was suppose to be 35 boxes a day, complete including finishing. I told them I was busy with a kitchen and I could work for them for 1/2 days until my kitchen was completed. Never knew why and never heard from him again. The work went on for another couple of months until one day I went there and the door was locked, business closed. DIY was my first question LOL. I told them that what they did sucked, loosing my benefits and then telling me that I was inconveniencing them by leaving. I had questions on how many wires that could be put into a conduit. I found out that I was being rehired as a new employee into a newly named company. At that time it was 1997 and I got my license. We were putting it through the widebelt sander when he came in. The expected great things from people who knew nothing. I got a job with one of the guys that use to work at the first millwork place making a kitchen. com. I taught them some things that I learned and vice versa. He said, see you Monday ..More

  • Renovation Contractor & Builder Lake Havasu City, AZ
  • Renovation & Handyman Services Ames, IA
Basement Options, Part 1: Flooring

Top 10 contractors - Service Call Forums - ? Carpet?s Okay?Maybe. Residential & commercial services - small roof repair, residential flat roof, commercial flat roof repair, tin roof repair. But there is debate within the home improvement/building community as to the acceptability of carpet here. Carpet is warm and cozy and seems to be the logical floor covering for a cool basement. But if you have had a water problem in the past, you must consider the hassle and implications of a perpetually damp or wet carpet?these conditions are an invitation for mold and mildew. If you know you have a dry basement, and you Don't get moisture vapor that comes through your concrete slab subfloor, carpet may be a suitable choice ..More

  • Home Restoration Solutions Midwest City, OK
  • Construction Contractor & Repair Arcadia, CA
Request A Quote
Kitchen & Bath Remodeling

Home Improvment Tips & Assistant Guide

requestaquote Get Free Quotes callnow 888-506-9527